翻訳と辞書
Words near each other
・ Ammeline
・ Ammelne
・ Ammembal Subba Rao Pai
・ Ammenabath
・ Ammendale Normal Institute
・ Ammende Villa
・ Ammenäs
・ Ammer
・ Ammer (Neckar)
・ Ammer Saddle
・ Ammerbuch
・ Ammerdown House, Kilmersdon
・ Ammerer Bed Company
・ Ammergau
・ Ammergau Alps
Ammergau Railway
・ Ammeris
・ Ammerland
・ Ammerländer Schinken
・ Ammerman
・ Ammermann
・ Ammerndorf
・ Ammersbek
・ Ammerschwihr
・ Ammersee
・ Ammersee Railway
・ Ammersoyen Castle
・ Ammerstol
・ Ammerswil
・ Ammerthal


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Ammergau Railway : ウィキペディア英語版
Ammergau Railway

The Ammergau Railway or ''Ammergaubahn'' (sometimes called the ''Ammertalbahn'' or "Ammer Valley Railway", originally the ''Lokalbahn Murnau–Oberammergau'') is a single-tracked, electrified railway line in Bavaria in southern Germany. It runs from Murnau to Oberammergau, its latter stages following the valley of the river Ammer from which it derives its name. This stub line to Oberammergau branches off at Murnau from the Munich–Garmisch-Partenkirchen main line.
== Operations and history ==

This 23.671 km long route was completed on 1 May 1900 under a Bavarian concession granted on 24 January 1897 to the Lokalbahn AG (LAG).〔Horst-Werner Dumjahn: ''Handbuch der deutschen Eisenbahnstrecken; Eröffnungsdaten 1835-1935''. Nachdruck nach Vorlage Reichsbahn 1935; Dumjahn, Mainz 1984, ISBN 3-921426-29-4〕 On 1 January 1905 it was electrified, becoming the first railway in Germany to run on single-phase AC power. Originally the line was electrified with 5.5 kV, 16 Hz AC. With effect from 1 August 1938 the LAG was transferred to the Deutsche Reichsbahn. But it was not until 1954/55 that the power system was converted to the usual 15 kV, 162/3 Hz by the Deutsche Bundesbahn, and four of the five DRG Class E 69 electric locomotives modified accordingly.
As cars increased in popularity, the Ammergau Railway was affected just as badly as other branch lines in the railway network. Goods traffic dwindled to virtually nothing and the number of passengers fell steadily to between 500 and 1,000 per day. As a result, a vast amount of infrastructure has been removed.
In 1999 there were negotiations with the passenger union Pro Bahn and DB Regio Bayern AG. Pro Bahn demanded ''inter alia'' a new crossing place at Altenau (Bay) and the retention of the second track at Oberammergau. That would have enabled journey times to be reduced by about 10 minutes. But the cost of about 4 million marks was too high and the project was put on ice.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Ammergau Railway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.